Issue Date: November 22, 1995
Revision Date: September 11, 1998
Xerxes Corp.
Xerxes
Trucheck Hydrostatic Monitoring System
INTERSTITIAL TANK TIGHTNESS
TEST METHOD
Certification |
Leak rate of 0.1
gph with PD = 99% and PFA = 1%. |
Leak Threshold |
0.05 gph.
A tank system should not be declared tight if the test result indicates a
loss or gain that equals or exceeds this threshold. |
Applicability |
Gasoline, diesel,
aviation fuel, fuel oil #4. |
Tank Capacity |
Maximum of 30,000
gallons.
Tank must be between 0 to 100% full. |
Waiting Time |
None between
delivery and testing. |
Test Period |
Minimum of 10
hours. |
Groundwater |
Depth to
groundwater in tank excavation backfill must be determined before and after
test.
When groundwater level is above bottom of tank but below top, test should be
repeated if groundwater level increases by more than 7 inches during test.
When groundwater level is above tank, test should be repeated if groundwater
level increases by more than 5 inches during test. |
Xerxes
Corp. |
Evaluator: Robert Plunkett, Ph.D. |
7901
Xerxes Ave. |
Tel: (612) 338-0945 |
Minneapolis, MN 55431 |
Date of Evaluation: 01/07/93 |
Tel:
(952) 887-1890 |
|
|