Issue Date: November 22, 1995
Revision Date: April 28, 2005

Tidel Engineering, Inc.

LIPSPC-301-0730-001, LIP-301-0729-001
Line Integrity Probe and Submersible Pump Controller

AUTOMATIC ELECTRONIC LINE LEAK DETECTOR

Certification

Leak rate of 3.0 gph at 10 psi* with PD = 100% and PFA = 0%. 
Leak rate of 0.1 gph at 1.5 times operating pressure* with PD = 100% and PFA = 0%.
*Since leak rate varies as a function of pressure, this leak rate and pressure were certified using an equivalent leak rate and pressure, in accordance with an acceptable protocol.

Leak Threshold 2.0 gph for leak rate of 3.0 gph. 0.06 gph for leak rate of 0.1 gph. 
A pipeline system should not be declared tight if the test result indicates a loss or gain that equals or exceeds this threshold.
Applicability Gasoline, diesel, aviation fuel.
Specification System tests pressurized fiberglass and steel pipelines. 
Tests are conducted at operating pressure.
Pipeline Capacity Maximum of 129 gallons.
Waiting Time None between delivery and testing. 
None between dispensing and testing.
Test Period Response time is 1 minute for leak rate of 3.0 gph. 
Response time is 1 hour, 30 minutes for leak rate of 0.1 gph. 
Test data are acquired and recorded by a permanently installed microprocessor. 
Calculations are automatically performed by the microprocessor.
System Features Permanent installation on pipeline. 
Automatic testing of pipeline. 
Preset threshold. 
Single test to determine if pipeline is leaking. 
Pump shutdown, message display, and alarm activation if leak is declared.
Calibration System must be checked annually and, if necessary, calibrated in accordance with manufacturer's instructions.

 

Tidel Engineering, Inc.

Evaluator:  Ken Wilcox Associates

2025 West Beltline Road, #114

Tel:  (816) 443-2494

Carrollton, TX  75006

Date of Evaluation:  02/02/93

Tel:  (800) 678-7577

 

 

 | Home | Vendors: A - F | Vendors: G - M | Vendors: N - S | Vendors: T - Z | Method Index | Glossary |

Appearance on this list is not to be construed as an endorsement by any regulatory agency nor is it any guarantee of the performance of the method or equipment.
Equipment should be installed and operated in accordance with all applicable laws and regulations.  For full details, please refer to our expanded "DISCLAIMER" page.