| Issue Date: November 22, 1995Revision Date: 
April 28, 2005
 
 OPW Fuel Management 
Systems(originally listed as Emco Electronics, Tuthill Transfer Systems)
 EECO System
LLD (Q0011) AUTOMATIC ELECTRONIC LINE LEAK
DETECTOR 
  
    | Certification | Leak rate 
    of 3.0 gph at 10 psi* with PD = 100% and PFA = 0%. Leak rate of 0.2 gph at operating pressure with PD = 100% and PFA = 0%.
 Leak rate of 0.1 gph at 1.5 times operating pressure* with PD = 100% and PFA 
    = 0%.
 *Since leak 
    rate varies as a function of pressure, this leak rate and pressure were 
    certified using an equivalent leak rate and pressure, in accordance with an 
    acceptable protocol.
 |  
    | Leak
      Threshold | 2.0 gph for leak
      rate of 3.0 gph. 0.1293 gph for leak rate of 0.2 gph. 0.0793 gph for leak
      rate of 0.1 gph. A pipeline system should not be declared tight if the test result
      indicates a loss that equals or exceeds this threshold.
 |  
    | Applicability | Gasoline, diesel,
      aviation fuel, fuel oil #4. |  
    | Specification | System tests
      pressurized fiberglass and steel pipelines. Tests are conducted at operating pressure.
 |  
    | Pipeline
      Capacity | Maximum of 67.4
      gallons. |  
    | Waiting
      Time | None between
      delivery and testing. None between dispensing and testing for leak rate of 3.0 gph.
 Ranges from 0 to 1 hour, 27 minutes between dispensing and testing for
      leak rate of 0.2 gph.
 Ranges from 0 to 2 hours, 48 minutes between dispensing and testing for
      leak rate of 0.1 gph.
 |  
    | Test
      Period | Response time is
      2 minutes for leak rate of 3.0 gph. Minimum of 9 minutes for leak rate of 0.2 gph.
 Minimum of 31 minutes for leak rate of 0.1 gph.
 Test data are acquired and recorded by a microprocessor.
 Calculations are automatically performed by the microprocessor.
 |  
    | System
      Features | Permanent
      installation on pipeline. Automatic testing of pipeline.
 Preset threshold.
 Single test to determine if pipeline is leaking.
 Pump shutdown, message display, and alarm activation if leak is declared.
 |  
    | Calibration | System must be
      checked annually and, if necessary, calibrated in accordance with
      manufacturer's instructions. |    
  
    | 
      OPW Fuel 
      Management Systems | Evaluator: 
      Ken Wilcox Associates
      
      
       |  
    | 
      6900 
      Santa Fe Dr. | Tel: 
      (816) 443-2494
      
       |  
    | 
      Hodgkins, IL 60525
      
      
       | Date
      of Evaluation:  12/31/93, 07/18/94
      
      
       |  
    | 
      Tel: 
      (708) 485-4200 |  
      
       |  
    | E-Mail:  
    info@opwfms.com |  |  
    | URL:  www.opwfms.com |  |  |