Issue Date:  April 28, 2005
 

MassTech International, Ltd.

MassTech 2 Wet Test
(Mass Based)

VOLUMETRIC TANK TIGHTNESS TEST METHOD (Underfill)

Certification Leak rate of 0.1 gph with PD > 100% and PFA < 0%.
Leak Threshold 0.05 gph
Applicability

Gasoline, diesel, aviation fuel, fuel oil #4, waste oil.
Ullage portion of the tank must be tested using an ullage test method.

Tank Capacity Maximum product volume of 30,000 gallons with ullage volume greater than 5% of total tank volume.
Waiting Time

Minimum of 15 minutes.

Test Period

Minimum of 30 minutes.
Test data is acquired by computer and forwarded electronically to an analysis center where proprietary software is used to assist in the determination of the tank condition.
Atmospheric conditions should not be subject to violent change during data collection process.

Temperature

System measures product mass (which is not affected by temperature) instead of product volume.
The temperature of added product should not differ more than 9.9 degrees Fahrenheit from that already in the tank to minimize ullage or product expansion or contraction due to temperature fluctuation.

Groundwater

If groundwater is above tank bottom or if depth to groundwater is not determined, the test must be conducted at two different ullage pressures (nominal 1.5 psi difference) to eliminate leak masking.

Comments A well point or observation well in the tank excavation backfill may help determine backfill material, water level in tank excavation backfill, and free product.
Operators must be trained and certified by the manufacturer.

 

MassTech International, Ltd.

Evaluator:  Ken Wilcox Associates, Inc.

102 Basile Road

Tel:  (816) 443-2494

Scott, LA 70583

Date of Evaluation:  11/26/04

Tel:  (337) 896-8230

 

E-mail: masstech1@compuserve.com  
URL: http://masstechinternational.com  
 

 | Home | Vendors: A - F | Vendors: G - M | Vendors: N - S | Vendors: T - Z | Method Index | Glossary |

Appearance on this list is not to be construed as an endorsement by any regulatory agency nor is it any guarantee of the performance of the method or equipment.
Equipment should be installed and operated in accordance with all applicable laws and regulations.  For full details, please refer to our expanded "DISCLAIMER" page.